TRADE SHOW SERVICE COORDINATION

Show Service Orders Coordinated Before Move-In Begins

Coordinate electrical, internet, rigging, material handling, cleaning, utilities, labor orders, and venue requirements so the services your exhibit depends on are ordered correctly and on time.

coordinating
BEFORE THE SHOW

The Booth Needs More Than the Booth

A finished exhibit structure may still require several services from the show organizer, general contractor, venue, or exclusive providers. Missing one order can affect installation timing, technology, lighting, cleaning, or the ability to operate the booth as planned.

Electrical

Coordinate power drops, outlet locations, amperage, and timing around monitors, lighting, kiosks, LED walls, charging stations, and other powered exhibit elements.

Internet + Connectivity

Review wired or wireless requirements for presentations, demos, lead capture, streaming, and connected exhibit technology.

Rigging

Plan hanging signs, suspended lighting, overhead structures, and venue-approved rigging requirements when the exhibit extends above the booth floor.

Material Handling

Coordinate the services that move exhibit freight from the receiving area to the booth and back out after dismantle.

Cleaning + Booth Services

Arrange booth cleaning and other show-floor services when they are required to keep the exhibit ready throughout the event.

Labor + Contractor Orders

Confirm required labor orders and other contractor services so installation and dismantle crews can work within the assigned schedule.

SHOW-SPECIFIC REQUIREMENTS

Every Event Has Its Own Rules

Service providers, order forms, discount deadlines, labor rules, rigging procedures, electrical restrictions, and venue requirements can change from one event to another. The right approach starts with the exhibitor manual for the specific show.

What We Review
  • Exhibitor service manual and contractor forms
  • Discount and standard-rate deadlines
  • Electrical and internet requirements
  • Rigging rules and hanging-sign procedures
  • Material handling and freight instructions
  • Installation and dismantle labor requirements
  • Cleaning, plumbing, compressed air, or specialty utilities
Why Timing Matters

Many show services cost more after advance-order deadlines. Late orders can also create availability or scheduling problems that affect the booth build.

  • Advance rates may be lower than on-site rates
  • Electrical layouts should match the booth design
  • Rigging may require drawings and early approval
  • Internet orders may depend on presentation requirements
  • Labor orders need to align with freight arrival
COORDINATED WITH THE DESIGN

Service Orders Should Match the Exhibit Plan

Show services are most effective when they are planned from the booth drawings, technology requirements, and installation sequence instead of ordered independently.

A


Power Where It Is Needed

Electrical orders can be mapped to the actual locations of monitors, lightboxes, kiosks, counters, lighting, and presentation equipment.

B


Rigging That Fits the Footprint

Hanging-sign placement should be coordinated with booth dimensions, venue restrictions, neighboring exhibits, and the overall design.

C


Labor That Matches Move-In

Installation labor, freight arrival, electrical access, and technology setup should be sequenced so one crew is not waiting on another.

OUR APPROACH

From Exhibitor Manual to Confirmed Orders

We organize show-service requirements around the exhibit and event schedule so important orders are addressed before they become move-in problems.

 


01

Review the Manual

Identify required forms, providers, deadlines, venue rules, and show-specific procedures.

 


02

Map the Requirements

Match power, internet, rigging, labor, handling, and other services to the approved exhibit design.

 


03

Place + Track Orders

Submit required orders and monitor confirmations, changes, and service-provider communication.

 


04

Verify Before Move-In

Confirm key services and timing so the installation team arrives with a clear operational plan.

Common Questions

Trade Show Service Coordination FAQs

These are common questions exhibitors ask when coordinating show services such as electrical, internet, rigging, material handling, cleaning, and other venue requirements.

Still stuck? Call (877) 730-5300) and talk to the person who would run your show.

PLAN THE BUILD BEFORE MOVE-IN

Need Help Coordinating Exhibit Setup?

Share the show, booth size, city, move-in dates and exhibit type. We can help plan the installation and dismantle requirements around your event schedule.